You are here: Home > Business > Case Study: Canberra Olympic Swimming Pool

Case Study: Canberra Olympic Swimming Pool

Background:The Canberra Olympic Swimming Pool development was an ACT Government adjourned action to remove, alter and recycle the absolute 22-year-old air-supported film asylum in adjustment to advancement the look, feel, and functionality of the facility.

Scope of Work:

The backup anatomy was appropriate to be a clear-span architecture with arced beam in the actualization of a dome. PVC compactness bolt with a dejected and white colour arrangement was defined to bout the absolute anatomy design.

Key architecture belief included:

* Improve functionality and beheld actualization compared to absolute structure

* Easy to clean, maintain, and repair, with the adeptness to alter ancillary panels if necessary

* Provide a comfortable, ablaze and aerial centralized atmosphere after boundless calefaction or humidity, through all seasons of the year

* Adeptness to accessible the abandon in summer for acclimate control

* Absorb a blind framework for flags, ropes and added equipment

* Absorb a automated blast arrangement and a abeyant centralized beam liner aural the roof amplitude to aid centralized ecology control

* Capable of acknowledging abundant assignment roof fans, bogus lighting, and electrical cabling

* Structural animate framing to accept bane aegis acceptable for an calm chlorinated pool

* Absolute air-supported film to be removed and recycled in accordance with the ACT “No Waste” strategy

The Solution:

The accepted Supa-Span-C architecture was customised to absorb key activity requirements. The animate bandage framing was engineered to accommodate the appropriate electrical and blaze apprehension systems, and bogus with a appropriate three-coat top body paint, to abstain erosion. Ferrari 702s film was called to clad the anatomy with the 502s ambit called for an centralized liner.

Comments are closed.